PTH 90

New call-to-action
Hotline : +41 24 4820 110

Key benefits

  • Fast return on investment
  • Small footprint
  • Quick tooling change
  • Tooling compatibility across most other PTH models
  • Reliability
  • Low maintenance
  • Reduced down-time
  • Ease of operation
  • Sophisticated, adaptive 2-step moulding technology
  • Tube sampling capability using 1 or 2 tooling stations instead of the standard 9 possible

Technologies

Machine specifications

Machine capabilities

Up to 90 tubes/min.
Tube Ø13.5 mm to 63.5 mm
Tube lengths 60 mm to 235 mm

Value-adding options

Printed sleeve orientation
Servo-driven dosing system
Oval tube heading system
Transfer systems for line integration

Quality Control Systems

Shoulder and orifice quality control
Sleeve orientation inspection
Shoulder thickness control
Bacomex™ inspection